Crane Tech Supports a 240,000-pound Crawler Crane to Support

Тук ще получавате повечко информация за новости по играта и такива неща

Crane Tech Supports a 240,000-pound Crawler Crane to Support

Мнениеот upamfva на Пон Сеп 26, 2022 5:37 am

Crane Tech Supports a 240,000-pound Crawler Crane to Support Customers



This vitally important project was addressed in the same way we work with customers. Everything is done to the closest possible perfection. We invest in the appropriate technology, equipment, methods, and people to support those training with us to achieve superior excellence. The addition of the Crawler Crane will enhance our decades of consistent vision: to not merely train crane operators but to lift the entire industry to measurable excellence.Get more news about Pendant Rope,you can vist our website!

Expanding our training equipment by adding a new Manitowoc 222 Crawler Crane posed challenges such as how to handle the prep work without interfering with ongoing training and other yard work. Where in our equipment training yard would this crane be best suited to function in harmony with other equipment? You don’t just drop something the size of a brontosaurus on the ground and start working. Prep began by excavating an area 24-feet by 35 feet and 18 inches deep. Being a few hundred yards from Tampa Bay, the possibility of unstable soil held concern.
Florida Geotechnical Exploration (FGE) was hired to evaluate how well the area selected for the crane would support the weight and dynamics of the working Manitowoc 222. FGE arrived and tested the soil in multiple locations within the excavated area.

Based on our conversation with the FGE engineer at the site, final preparation began prior to receiving their report by adding more stabilizing base and creating a final grade for the timber mats. The crane mats arrived on schedule and were stacked ready to install. The mats are 8” thick oak bolted together to create a 4-foot wide by 22-foot-long mat. Each mat can withstand 237,000-pounds of compression. Six mats are stacked and ready to be installed. Mats will lay perpendicular to the crane’s crawler treads.

At the crane’s center of rotation (CR), heavy wall pipe was driven into the ground creating a permanent CR reference. The final analysis showed that no more than a 0.05-inches of settlement would occur. Customers are already training for new skills on the crane!
The drive to promote and train for safety and skills is our ongoing dedication to lift the quality of our entire industry: increase the value and expertise of crane operators, reduce/eliminate accidents, and support a company’s productivity.

upamfva
Титуляр в "Б" група
 
Мнения: 894
Регистриран на: Вто Апр 12, 2022 10:22 am

Назад към Новини

Кой е на линия

Потребители разглеждащи този форум: 0 регистрирани и 28 госта


С подкрепата на